Dear All,
I have some issue with MRP run Date & plant delivery date,
01) Material Code is - XXXXX
02) Planned Deliv. Time in MM03 (MRP-2) - 10 Day's
03) MRP Run on 07.03.2015
04) Planned deliv. Time Calculation As Per MM03 (MRP-2) - 17.03.2015
05) SAP / ME5A Showing Plant Deliv.Time 27.03.2015 (10 Day's Extra)
Actually as per MM03 (MRP-2) SAP should take 10 days from MRP Run.
My most of material have this type issue. All are request to plz guideline me.