Re: Include Resp. Cost center field in CN41 report through SAP Note 43493

$
0
0

Hi Saurabh,

 

Have you tried to switch to other hierarchy, I mean 000000000003?

 

I have not tried this myself, but in theory that will take the Cost center hierarchy into the leading column.

 

Regards,

Paulo


Re: RRB Billing DP93

$
0
0

Hi Srini,

 

please elaborate your requirement as nothing is clear from your question posted.

 

thanks

Sunil

Re: Goods Issue to Production order in ProMan

$
0
0

HI Vikram,

 

i dont see any settings related to field selection for PROMAN. this might be Authorization issue Please check SU53 screen when you get gray field for PGI.

 

in SAP Standard below are the steps:

 

Posting a Goods Issue

You use this function to post a goods issue for a reservation, for example, for production. This is for internal procurement only and the item category must indicate inventory management. You cannot post a goods issue for a delivery here.

  1. Select the component.
  2. Choose Execute.
  3. Choose Post Goods Issue.
  4. Enter the required data on the dialog box that appears, such as the quantity for which you want to post the goods issue.
  5. Choose Execute

The change is shown on the Quantities and Stock overviews.

 

thanks

Sunil

Re: Investment program Report for WBS

$
0
0

Hi Paulo,

 

Thank you so much for sharing vital info, however is are there tcodes/reports which will display :-

 

1. All Investment heads and their respective budget.

2. Investment head - WBS - Budget Assigned.

 

Thank you in advance

 

 

rgds

Re: Investment program Report for WBS

$
0
0

Hi

 

You can use the t code IM53 -Display Budget Distribution

 

it will display the requirements

 

1. All Investment heads and their respective budget.

2. Investment head - WBS - Budget Assigned.

 

 

Regards

 

Vijay kumar Hebbal

Re: RRB Billing DP93

$
0
0

Is ur WBS enabled as an Billng element. Please check that

Re: RRB Billing DP93

$
0
0

Hi Srini,

 

according to DIP profile material determination will be done. for example: if you posted timesheet and activity type has settings to material determine than than material will come in DMR.

 

please let us know your settings in DIP profile first.

 

thanks

Sunil

Re: Include Resp. Cost center field in CN41 report through SAP Note 43493

$
0
0

Hi Paulo,

 

Thanks for your response.

 

Yes, I tried it just now but it does not bring Resp. Cost center into picture.

 

Regards

Saurabh


Re: Include Resp. Cost center field in CN41 report through SAP Note 43493

$
0
0

Hi Saurabh,

 

I think you need to maintain the Cost Center hierarchy first.  There is an hierarchy ID in the pop-up window.  Do you mean it just gives an empty output or any error message?

 

Thank you,

Paulo

Re: Settlement error repeats

$
0
0

Hallo Maria,

the issue is that the error messages does not seem to have any reason at all,

an example would be

        Sender: WBS CPX.000XXXXX-F1                  
BP604 Item 001 WBS element C14.XXXXX-F2 budget exceeded                          
BP604 Item 003 WBS element C14.XXXXX-F2 budget exceeded                          

However CPX.000XXXXX-F1 is in no way related to the receiver C14.XXXXX-F2, it is not in the same structure, it has a settlement rule to an AUC and since it does not have any other errors it is expected that settlement would take place.

Re: WBS Element Numbering

$
0
0

Mr. Rafi,

I need to do the same with hierarchy WBS. Lower level must respect always superior level.

Exemple:  I have code ZZZ-BB-17-9/11 ( PRPS-STUFE = '2' with 10 positions) but I shouldn´t save level 3 with ZZZ-BB-17-9/AA-01 (12 position), because 'AA' is different than '11'.

 

I tried, but unsucceded:

Prerequisite: PRPS-STUFE = '3'

check:  PRPS-POSID :1-12: >= RCJ_PRPSUP-POSID :1-10:

msg: whatever

 

any help, thanks

Re: Validation for WBS elements

$
0
0

Gentlement,

 

I need your help with validation in hierarchy WBS. Lower levels must respect WBS superior levels.

How could we do it.

thanks

WBS VALIDATIONS.png

S_ALR_8713531 & CNS41 reports mismatch

$
0
0

Hi All,

 

Material reservations placed on a network activity/work order calculate a "Remaining Order Plan" however when the reservations are issued the remaining order plan is not reducing and causing active funds issues on projects. When work orders are closed so that the reservations are finalised the remaining order plan is not being removed from all SAP transactions (i.e. removes from S_ALR_87013558 but not from CNS41) which ever tables are generating the calculation for active funds is not being updated/removed.


Please suggest on this issue.


Thank you.


Regards,

Mayur

Re: Table for approved budget

$
0
0

Hi Maria,

 

I am trying to use JCDS table which will show the user and system status of the wbs along with the posting date and then capture the budget value from BPEG for the wbs with REL status.

 

I will try the method which you have suggested , lets me check which will be feasible for BI team to capture the values for monthly budget.

 

regards,

GVK

Re: Table for approved budget

$
0
0

Hello,

Collect objnr from prps table pass it in jcds which have user status and system status based on that pass filter data in BPGE, BPEG,BPJA, BPEJ.

such RPSCO is the master table of project account posting so filter those based on value type. it might be fulfill your retirement.

 

Regards,
Sanjeev


Re: Include Resp. Cost center field in CN41 report through SAP Note 43493

$
0
0

Hi Paulo,

 

The cost center hierarchy ID is maintained in structure info. system :

 

 

Untitled.png

When I select this and execute t-code CN41, it says " Alternative hierarchy could not be determined"

 

Please suggest if there is any proper procedural steps to bring "resp. cost center" field into picture.

 

Thanks & regards

Saurabh

Cut Over Stratergy

$
0
0

Dear All,

We are going to fix cut over stratergy for go-live, but i as per requirement, i need to capture all historical costs and revenues (which were inccured in legacy system) into SAP. So i have very much confusion in this regards,kindly help me on this.

 

     Here the challenge is that, we need to calculate the RA (Cost based POC method) values in SAP based on cummulative Costs and Revenues both

Planned and Actuals.

 

I have read some blogs but still i have no clarity on bringing the historical Costs and Revenues into SAP. If any one can explain in detail that will be helpfull for me. Also please guide me how the WIP will be brought into project.

 

 

 

 

So please guide me how to achieve this.

 

 

 

 

Regards,

Rao.

Re: Report to show items capitalized and items not capitalized for a particular wbs

$
0
0

Hi,

Please check MBBS report, which will give you information about valuated project stock ( not capitalized items) and in the same report you can find the items which are capitalised with zero quantity and zero value.

 

 

 

Regards,

Rao

Re: Include Resp. Cost center field in CN41 report through SAP Note 43493

$
0
0

Hi Saurabh,

 

My best guess would be for you to try to create this hierarchy id called K0001_HIER that includes some of your Responsible Cost Centers to see if you get anything.  Or you can just take a copy from your standard hierarchy.

 

Regards,

Paulo

Re: Include Resp. Cost center field in CN41 report through SAP Note 43493

$
0
0

Hi Paulo,

In t-code OKEON, I copied std. hierarchy into K001_HIER and regenerated the report CN41N with profile 000000000000003 but still it doesn't give me cost center in o/p.

 

is it giving you values in your system? I am not sure if I am following correct steps for it.

 

Thanks & Regards

Saurabh